Abutment 1 Grading
|
Bridge Parapet and Sidewalk Work
|
NY Ave. Inbound Right Lane
|
|
|
|
|
South Side of Bridge and Median
|
|
|
| |
| |
|
|
|
|
Sidewalk and Parapet Form Work
|
Abutment 2 Approach Slab Work
|
Backfill of Retaining Wall 1
|
| |
|
|
|
Bridge Granite Curb Installation
|
Pushing Water Line Casing at Abutment 1
|
|
| |
| |
|
|
|
Retaining Wall 1 Form Work For Wall Pour
|
Reinforced Slope Adjacent To New York Avenue
|
Night Time Deck Pour Operations Using Bidwell Machine
|
| |
|
|
|
10 Inch Concrete Base Pavement On Brentwood Parkway
|
|
|
| |
|
|
|
|
Brentwood Ave. Grading to Subbase
|
Bridge Concrete Pour
|
Bridge Upper Mat Rebar Placement
|
| |
|
|
|
NY Ave. Slope With Seed & Mulch
|
|
|
| |
| |
|
|
|
|
Bridge Deck Pan Placement
|
Bridge Rebar Placement
|
NY Ave. Reinforced Slope Placement
|
| |
|
|
|
Roadway Grading Abutment 2 Area
|
|
|
| |
| |
|
|
|
Abutment 2 Storm Drain Placement
|
Bridge Deck Pan Placement
|
Bridge Edge Work and Rail Placement
|
| |
|
|
|
| Bridge Wood Deck Placement |
|
|
| |
| |
|
|
|
|
18 Inch Underdrain
|
Span 1 Deck Forms
|
Span 4 Deck Forms
|
| |
| |
|
|
|
From Abutment 2 Looking North
|
From Pier 3 Looking North
|
Snow Removal
|
| |
|
|
|
First Girder of Span 2 Structural Steel
|
Second Girder of Span 2 Structural Steel
|
|
| |
| |
|
|
|
Constructed Piers 1 and 2 Looking North
|
Abutment 2 MSE Wall
|
|
| |
|
|
|
|
Abutment 2 Looking North
|
Abutment 1 Looking South
|
|
| |
|
|
|
Project From Bridge Pier 2 and Pier 1
|
Abutment 1 Looking South
|
|
| |
|
|
|
|
Pier 1 Cap Finishing Beam Seats
|
Pier 1 Cap Pour
|
Abutment 1 MSE Wall
|
|
|
|
|
Pier 2 Setting Column Rebar
|
Pier 3 Driving and Splicing Pile
|
Pond Excavation Haul Offsite
|
| |
|
|
|
Project view from Abutment 1 (T-Street)
|
Project view from Abutment 2 (NY Ave)
|
|
| |
|
|
|
|
Pile Driving at Pier 1
|
Pouring concrete for Pier 1 Footer
|
500 Ton Crane Ready for Girder Removal
|
|
|
|
Rigging West Ramp Girder for Removal
|
Crane in positon and attached to girder
|
West Ramp Girder cut free and suspended by Crane. Weight is nearly 60 Tons!
|
|
|
|
|
Demolition at West Ramp
|
Pile Driving at Abutment 2
|
Sawcutting for Demolition
|
|
|
|
Concrete Deck Removal at West Ramp
|
Pile Driving at Abutment #2
|
Concrete Removal Continues
|
|
 |
|
Water Main Relocation Work at Abutment 1
|
Concrete Removal Complete at West Ramp |
|
| |