aerial view

 
Brentwood Interchange
Brentwood Interchange
 
9th Street Bridge Over New York Avenue
9th Street Bridge Over New York Avenue
 
9th Street Bridge
9th Street Bridge
 
August 2010     Click to Enlarge Picture Below
Abutment 1 Grading Bridge Parapet and Sidewalk Work NY Ave. Inbound Right Lane
   
South Side of Bridge and Median    
 
June 2010  
Sidewalk and Parapet Form Work Abutment 2 Approach Slab Work Backfill of Retaining Wall 1
 
Bridge Granite
Curb Installation
Pushing Water Line Casing
at Abutment 1
 
May 2010     
Retaining Wall 1 Form
Work For Wall Pour
Reinforced Slope Adjacent
To New York Avenue
Night Time Deck Pour
Operations Using Bidwell
Machine
 
10 Inch Concrete Base
Pavement On Brentwood
Parkway
 
April 2010
Brentwood Ave. Grading
to Subbase
Bridge Concrete Pour Bridge Upper Mat
Rebar Placement
 
NY Ave. Slope
With Seed & Mulch
 
March 2010
Bridge Deck Pan Placement Bridge Rebar Placement NY Ave. Reinforced
Slope Placement
 
Roadway Grading
Abutment 2 Area
 
February 2010
Abutment 2 Storm
Drain Placement
Bridge Deck Pan Placement Bridge Edge Work
and Rail Placement
 
Bridge Wood Deck Placement
 
January 2010
18 Inch Underdrain Span 1 Deck Forms Span 4 Deck Forms
 
December 2009
From Abutment 2
Looking North
From Pier 3 Looking North Snow Removal
 
First Girder of Span 2
Structural Steel
Second Girder of Span 2
Structural Steel
 
November 2009
Constructed Piers 1 and 2
Looking North
Abutment 2 MSE Wall
 
October 2009
Abutment 2 Looking North Abutment 1 Looking South
 
September 2009
Project From Bridge Pier 2
and Pier 1
Abutment 1 Looking South
 
August 2009
Pier 1 Cap Finishing Beam Seats Pier 1 Cap Pour Abutment 1 MSE Wall
Pier 2 Setting Column Rebar Pier 3 Driving and Splicing Pile Pond Excavation Haul Offsite
 
July 2009
Project view from Abutment 1
(T-Street)
Project view from Abutment 2
(NY Ave)
 
June 2009
Pile Driving at Pier 1 Pouring concrete for Pier 1 Footer 500 Ton Crane Ready for
Girder Removal
Rigging West Ramp Girder
for Removal
Crane in positon and attached
to girder
West Ramp Girder cut free and
suspended by Crane. Weight is nearly
60 Tons!
May 2009
Demolition at West Ramp Pile Driving at Abutment 2 Sawcutting for Demolition
Concrete Deck Removal at
West Ramp
Pile Driving at Abutment #2 Concrete Removal Continues
Water Main Relocation Work
at Abutment 1
Concrete Removal Complete at
West Ramp